Schedule 40, 80 and 160 are wall-thickness series, not pressure ratings. For any given NPS the outside diameter stays fixed. The wall gets thicker as the schedule number climbs, so the bore gets smaller. A higher schedule usually means the pipe can handle more pressure, but the actual allowable pressure has to be calculated from the material, the design temperature and the governing code. The schedule number on its own tells you nothing about that.
| Factor | Schedule 40 | Schedule 80 | Schedule 160 |
|---|---|---|---|
| Wall thickness | Lightest of the three | Roughly 40–55% thicker than Sch 40 | Roughly 2× to 2.5× Sch 40 |
| Inside diameter | Largest | Reduced | Smallest |
| Weight per metre | Lowest | Moderate | Highest |
| Pressure capability | Lowest — must be calculated | Higher — must be calculated | Highest — must be calculated |
| Typical service | General process, water, utility, structural | Higher-pressure process, threaded lines, mechanical duty | Severe high-pressure, small and medium bore |
| Fabrication effort | Straightforward | More weld passes, heavier handling | Significant weld prep, heavy handling, slower fit-up |
| Relative cost | Baseline | Higher | Substantially higher |
| NPS | DN | OD (mm) | OD (in) | Sch 40 (mm) | Sch 40 (in) | Sch 80 (mm) | Sch 80 (in) | Sch 160 (mm) | Sch 160 (in) |
|---|---|---|---|---|---|---|---|---|---|
| 1/2″ | 15 | 21.3 | 0.840 | 2.77 | 0.109 | 3.73 | 0.147 | 4.78 | 0.188 |
| 3/4″ | 20 | 26.7 | 1.050 | 2.87 | 0.113 | 3.91 | 0.154 | 5.56 | 0.219 |
| 1″ | 25 | 33.4 | 1.315 | 3.38 | 0.133 | 4.55 | 0.179 | 6.35 | 0.250 |
| 1-1/2″ | 40 | 48.3 | 1.900 | 3.68 | 0.145 | 5.08 | 0.200 | 7.14 | 0.281 |
| 2″ | 50 | 60.3 | 2.375 | 3.91 | 0.154 | 5.54 | 0.218 | 8.74 | 0.344 |
| 3″ | 80 | 88.9 | 3.500 | 5.49 | 0.216 | 7.62 | 0.300 | 11.13 | 0.438 |
| 4″ | 100 | 114.3 | 4.500 | 6.02 | 0.237 | 8.56 | 0.337 | 13.49 | 0.531 |
| 6″ | 150 | 168.3 | 6.625 | 7.11 | 0.280 | 10.97 | 0.432 | 18.26 | 0.719 |
| 8″ | 200 | 219.1 | 8.625 | 8.18 | 0.322 | 12.70 | 0.500 | 23.01 | 0.906 |
| 10″ | 250 | 273.1 | 10.750 | 9.27 | 0.365 | 15.09 | 0.594 | 28.58 | 1.125 |
| 12″ | 300 | 323.9 | 12.750 | 10.31 | 0.406 | 17.48 | 0.688 | 33.32 | 1.312 |
| Schedule | Wall (mm) | Inside diameter (mm) | Bore area vs Sch 40 |
|---|---|---|---|
| Sch 40 | 6.02 | 102.26 | 100% |
| Sch 80 | 8.56 | 97.18 | 90% |
| Sch 160 | 13.49 | 87.32 | 73% |
| Schedule | Wall (mm) | Weight (kg/m, carbon steel) | Weight vs Sch 40 |
|---|---|---|---|
| Sch 40 | 6.02 | ~16.1 | 1.0× |
| Sch 80 | 8.56 | ~22.3 | 1.4× |
| Sch 160 | 13.49 | ~33.5 | 2.1× |
At the same nominal size it has a thicker wall, so it will generally withstand more internal pressure in the same material at the same temperature. But “stronger” depends on what’s loading it. For external mechanical loading, buckling or bending, the answer depends on the section properties and the support arrangement, not just the wall.
Yes. Within the applicable dimensional standard, all schedules at a given NPS share the same OD. Only the wall and the bore change. That’s what makes fittings, flanges and supports interchangeable across schedules.
No, and they’re not interchangeable. Schedule is a wall-thickness designation for pipe. Pressure class (150, 300, 600 and so on) applies to components like flanges and valves, and the actual pressure a class permits varies with material and temperature according to the relevant pressure-temperature rating tables.
No, and they’re not interchangeable. Schedule is a wall-thickness designation for pipe. Pressure class (150, 300, 600 and so on) applies to components like flanges and valves, and the actual pressure a class permits varies with material and temperature according to the relevant pressure-temperature rating tables.
There’s no universal answer, and any source that gives you one without asking about material, temperature and code isn’t giving you engineering advice. Calculate the minimum wall from the governing code for your actual conditions, then select the schedule that meets it.
Schedule selection is straightforward once the design inputs are settled. The difficulty is almost always in getting those inputs right, and in resisting the temptation to substitute on the basis of what’s in stock.
We hold a broad range of pipes and tubes across carbon steel, stainless, duplex and nickel alloy grades in the standard schedules, with certification to suit project requirements. If you’re working from a drawing and want the material cross-checked against the schedule and grade before it goes to order, that’s worth a conversation. It is a good deal cheaper than a rejection at site.
As a pipes and tubes supplier we can also advise on availability where a specified schedule is difficult to source in a particular grade and size.
Contact our pipe team with your size, grade, schedule, quantity, destination and required certification, and we’ll come back with a quotation.
